The Revere Gold Project covers 171km² approximately 90km northeast of Meekatharra in Western Australia’s Murchison region. The Project sits along the interpreted extension of the Andy Well Greenstone Shear System, a highly prospective gold corridor that also hosts several significant gold and copper-gold deposits.
In May 2026, Everest Metals delivered a major project milestone with the announcement of a maiden JORC-compliant Mineral Resource Estimate of 15Mt at 0.54g/t gold for 261,000 ounces. The resource is defined across the Big John and Armstrong deposits, with more than 40% classified in the higher-confidence Indicated category.
Gold mineralisation begins at surface, extends beyond 100 metres in depth and remains open along strike, highlighting the considerable exploration upside across the Project. Importantly, only around 25% of the 6km-long Revere Reef system has been systematically drill tested, providing substantial potential to expand the existing Mineral Resource.
Gold at Revere is hosted within a series of quartz reefs that form the extensive Revere Reef system. Historic alluvial gold discoveries date back to the early 1900s, while metallurgical testwork and bulk sampling have demonstrated the deposit’s free-milling characteristics, indicating the potential for straightforward gold recovery through conventional gravity processing methods.
With a growing Mineral Resource, favourable metallurgy and significant exploration upside, Revere represents a key growth asset within Everest Metals’ portfolio. A scoping study is planned to evaluate development pathways and further advance the Project towards production.

















